| Business Performance Associates, Inc. | |
||
|
|
TEMP007
Validation Final Report Template (RiskValSM) |
||
The instructions
and examples in this template provide a guide for how the final report
for a validation is written. The validation approach is explained, including
the implications of the system’s risk level for that validation.
The final report also includes an analysis of how well the high- and moderate-risk
functions worked, the effectiveness of risk mitigations, and an assessment
of the residual risk. A summary of a risk/benefit analysis is included
if the system remains at the high-risk level. The instructions and examples
for the “Analysis of the Validation Results” section include
a table with the listing of deliverables that could form the validation
record. This table is easily edited to match your validation. |
|||
Contact
Us Call Tim Stein at 408-366-0848 |
|||